Jahad Sazandegi Street (Hepco), beginning of Shahid Beheshti Town, Phase ۲, Arak Municipality Central Building
Scan and download
All rights reserved. © 2026
In line with increasing the safety of citizens' traffic and improving traffic conditions, the bridge located at the end of the slaughterhouse area was removed. This action was carried out with the aim of removing potential obstacles, reducing traffic hazards, and facilitating the movement of vehicles and pedestrians.