Concrete pouring for the upper section of the second part of the waterfront wall on the northern side opposite Amir Kabir Park, with a length of 32 meters and a height of 2 meters, was carried out.
This phase of the operation is progressing with the aim of completing the structural cross-section of the waterfront wall and ensuring the necessary strength, in accordance with technical requirements and under supervision of the quality of the concrete work.
