Road subgrade works are underway in this complex with the aim of preparing the necessary foundation for the implementation of the next stages of construction projects, creating suitable access, and providing the infrastructure needed for residents to live in the complex.
At this stage, measures such as leveling and smoothing the routes, compacting and densifying the soil, implementing grading and a drainage system to properly direct surface water, planning routes for cables and utility channels, as well as curbing and constructing sidewalks are on the agenda. These measures provide the necessary groundwork for the implementation of asphalt and the final surfacing of the roads.
Implementing these operations plays an important role in improving access infrastructure, facilitating the movement of vehicles and pedestrians, increasing safety, and enhancing the quality of life of residents, and it also paves the way for accelerating the implementation of the next stages of construction plans and preparing the complex for residents to live in.
