
منطقه5
04/07/2026
Municipal construction measures by District 5 Municipality of Arak as part of a jihadist initiative
According to the Public Relations and International Affairs Department of Arak Metropolitan Municipality, in this regard, projects including paving Bahrami Street, organizing the sidewalk at the end of Qaem-Maqam Street, replacing curbstones in Forouzan Alley, and also cleaning up and removing the unsightliness of the vacant lot on Shahid Rast Boulevard, with the aim of improving the urban appearance and citizens' welfare, have been implemented. These measures have been carried out within the framework of the municipality's jihadist and service-oriented approach, with emphasis on speed, quality, and responsiveness to local demands.

منطقه5
11/07/2026
Paving of the alleys of Sheikh al-Islam and Agha Zia al-Din in Arak's historic bazaar
The manager of the historic fabric district of Arak Municipality said: In line with preserving and maintaining the valuable historic bazaar complex and with the aim of improving the passages and alleys of the bazaar, the paving and stone-paving operations of the Sheikh al-Islam and Agha Zia al-Din alleys of this complex, from the Mohseni Street side, are underway. According to the Public Relations and International Affairs Department of Arak Municipality, Hossein Mansouri Zadeh added in announcing the news: Considering the deterioration of the asphalt in the Sheikh al-Islam and Agha Zia al-Din (second and sixth) alleys of the historic bazaar from the Mohseni Street side, and the inconsistency of the asphalt with the structure of this historic complex, the stone-paving operation of these alleys has been placed on the district's agenda. He further noted: The executive operation of stone-paving the Sheikh al-Islam alley has been completed, and the removal of the asphalt in the Agha Zia al-Din alley from the Mohseni Street side has been carried out, and with the participation of the municipality and the electricity department, the removal of the electricity poles in this alley in order to continue the substructure and stone-paving operations is underway. At the end, the manager of the historic fabric district of Arak Municipality thanked the bazaar shopkeepers and citizens for their cooperation with the municipality in carrying out construction and restoration measures in the Arak historic bazaar complex.
