The concrete pouring operation for the columns of the first mezzanine floor of the fire station building located on Taleghani Street is underway.
This operation is being carried out with the aim of completing the structural frames, ensuring the continuity of the load-bearing elements, and providing the basis for the next stages of the building's concrete skeleton construction.
