Rock excavation operations within the peripheral ring area are underway with the aim of correcting the route cross-section, clearing the bed, and providing the required standard width.
With the implementation of these operations, the geometric conditions of the route are improved and the necessary foundation for completing the subgrade and carrying out the next stages of the peripheral route is provided.
